The situation

Neither the supply chain director nor the manufacturing director could see the pattern from their own seat.

Plant Manager scope: x-ray lines, digital detectors, NDT and pooled-asset refurbishment in an FDA-regulated, ISO 13485 environment. Material outages were paralyzing production. Directed elsewhere for months; root cause identified in 20 minutes once the right data sets were overlaid.

20 min
To root cause, once the data sets were overlaid

The outcome

90%
Material outage reduction
72%
Monthly output increase

How it happened

  • Cross-domain overlay of workforce hire dates against parts outages surfaced the root cause
  • No field supply chain experience in the role; institutional vendor knowledge had no foundation to build on
  • Legacy SAP recovery rebuilt procurement discipline; cross-training reduced single-point dependencies
  • Process flow and scheduling optimization in the test labs improved throughput and delivery reliability
  • 71% OTD improvement and 30% reduction in escaping defects, sustained through a CEO-change restructuring
  • Cross-domain data overlay
  • SAP recovery
  • Cross-training
  • Scheduling