Benjamin Moore, Johnstown, NY · Production Manager

A result from Todd Kayhart’s role at Benjamin Moore before he founded Interstitial Operations Group. It is not an IOG client engagement.

The situation

On-time shipments at 85% and changeovers averaging 45 minutes.

Scheduling and changeover performance at the Johnstown plant. The fix was sequencing discipline: combine like runs, dedicate lines, and schedule against what the field actually needed.

45 min
Average changeover on arrival

The outcome

95%
On-time delivery, up 10 points
15 min
Changeovers, down 50%

How it happened

  • Built daily sequencing to combine like runs and reduce washouts and changeovers
  • Dedicated lines to specific product families and situations
  • Prioritized production against field inventory need
  • Wash generation down 45%
  • PM program redesign delivered a 16% efficiency gain
  • Site set its 2013 annual output record
  • Site rose from 3rd to 1st in company-wide engagement ranking in six months
  • Daily sequencing
  • Campaigning
  • Line dedication
  • PM program redesign